List of activities for erecting a canteen in a factory is given below. Draw the AOA network and identify critical path. Precedence Normal Activity activity Duration A - B A C A D D E C, D, E Draw AOA network. Calculate EST, EFT, LST, LFT and total float for each activity. Also find the critical path and project duration.
[3 marks]Differentiate between PERT and CPM.
[4 marks]What is RACI matrix? Discuss its usefulness to project manager.
[7 marks]Discuss EVA for project control.
[7 marks]Discuss matrix organization structure for project. How it is different from project type organization structure?
[7 marks]“Project control should always focus on critical path.” Comment.
[7 marks]Discuss Time-Cost Tradeoff for scheduling of the project.
[7 marks]Consider a project as follows. Draw AOA network, determine expected project duration. What is the probability that the project will be completed in expected project duration? Activity A B C D E F G H Immediate Predecessor - A A C B, C B, C C D, E Optimistic Time 2 0.5 1 1 6 3 1 Most Likely Time 2 2.5 1.5 2.5 7 4 2 Pessimistic 8 7.5 11 7 8 11 3
[8 marks]What are some potential problems with top-down and bottom-up budgeting processes? What are some ways of dealing with these potential problems?
[7 marks]Discuss Critical Chain Project Management (CCPM)
[7 marks]Discuss Work Breakdown Structure (WBS) with an example.
[7 marks]What is resource loading? How does it differ from resource leveling?
[7 marks]Differentiate between general management and project management.
[7 marks]Discuss various skills to be considered in the selection of a project manager.
[7 marks]Discuss the trade-off among the three prime objectives of project management.
[7 marks]List and briefly describe the ways projects may be terminated.
[7 marks]What is Project? Discuss Project Life Cycle in detail.
[7 marks]