Explain the hydrological cycle with neat sketch.
[3 marks]Enlist types of dams based on their function. Explain any one in brief
[4 marks]Discuss the various methods of determining the average depth of rainfall over a catchment.
[7 marks]List out the various methods used to calculate the average depth of rainfall over a catchment and explain any one with neat sketch.
[3 marks]Describe the various factors affecting run-off from a basin area.
[4 marks]The ordinates of flood hydrograph from a 4 hour rainfall are given below. Derive the ordinates of 4 hour unit hydrograph for a catchment area of 640 Km2. Time 0 4 8 12 16 20 24 28 32 36 40 (Hours) Discharge 30 68 205 410 330 254 195 133 95 58 30 m3/sec
[7 marks]The ordinates of 3 hour unit hydrograph are given below : Time 0 3 6 9 12 15 18 21 24 27 30 (Hours) Ordinates 0 10 25 20 16 12 9 7 5 3 0 cumecs Find the ordinates of a 6 hour unit hydrograph for the same basin, analytically. Also sketch this unit hydrograph. What is the peak value of discharge in this unit hydrograph ?
[7 marks]Give the difference between Specific Yield and Specific Retention for ground water.
[3 marks]Describe how to obtain the unit hydrograph from a flood hydrograph resulting from a storm of certain duration.
[4 marks]Design a tube well for the following data: 1. Yield required = 0.081 Cumec. 2. Thickness of confined aquifer = 30 m. 3. Radius of circle of influence = 300 m 4. Permeability co-efficient = 60 m/day. 5. Drawdown = 5.1 m.
[7 marks]Explain the terms with suitable example: Aquifuge, Aquiclude, Aquitard.
[3 marks]A 30 Cm diameter will completely penetrates a confined aquifer of permeability of 45 m/day. The length of strainer is 20 m. Under steady state of pumping, the draw down at the well was found to be 3.0 m and radius of influence was 300m. Calculate the discharge.
[4 marks]Give difference between: (I) Hyetograph and Direct runoff hydrograph, (II) Unit hydrograph and S-Hydrograph.
[7 marks]Explain causes of flood.
[3 marks]Give difference between Penstocks and Turbines.
[4 marks]Explain briefly all components of a hydroelectric power plant with neat sketch.
[7 marks]Write down the different methods available for Flood estimation and explain any one method.
[3 marks]Write a short note: Methods for Separation of Base flow.
[4 marks]Define the following with figure (1) Earthen dam (2) Gravity dam (3) Arch dam (4) Buttress dam (5) Spillway
[7 marks]Give difference between hydrological drought and meteorological drought.
[3 marks]Write the short note on Levees and Flood walls.
[4 marks]Explain theoretical probability distribution Gumbel’s method.
[7 marks]Discuss the factors affecting infiltration.
[3 marks]Write short note on flood forecasting and warning.
[4 marks]Describe the Flood routing with neat sketch.
[7 marks]