Differentiate the process layout vs Product layout.
[3 marks]Draw Flow process chart.
[4 marks]Describe the quality circle.
[7 marks]What is standardization?
[3 marks]Discuss the method of job sequencing.
[4 marks]Discuss assembly line balancing.
[7 marks]Discuss the least square method of sales forecasting with suitable example.
Define Productivity index.
[3 marks]State the application of workstudy in industries.
[4 marks]What is Work measurement? List the various techniques of work measurement and also explain how the standard time is calculated.
[7 marks]Define ergonomics.
[3 marks]What is therblig? State the importance of micro motion study.
[4 marks]Discuss the factors which should be considered for the site selection of cement industry.
[7 marks]Explain Minimum Wage, Fair Wage and Living Wage.
[3 marks]Discuss Ineffective time due to shortcomings on the part of management.
[4 marks]State wage incentive plans. Explain any one in details.
[7 marks]Difference between Job Evaluation and Merit Rating.
[3 marks]Discuss Ineffective time within the control of the worker.
[4 marks]Discuss any one method of job evaluation.
[7 marks]Explain TQM.
[3 marks]Differentiate ‘Variables’ and ‘Attributes’ with reference to quality control charts.
[4 marks]Explain the factory act 1948.
[7 marks]Enlist three provision provided in Employee Provident Fund Scheme, 1952.
[3 marks]Explain the characteristics of a normal distribution curve
[4 marks]Explain operating characteristic curve in detail.
[7 marks]