Define work study and state its field of applications.
[3 marks]What is scope of work study as an aid in raising productivity.
[4 marks]“Application of work study is 10% technical and 90% psychological” – Explain.
[7 marks]How would ergonomics help to analyze man – machine system ?
[3 marks]What do you understand by the term ‘work measurement’? What is its relationship with method study ?
[4 marks]Explain classification of movements and draw sketches showing normal and maximum working area.
[7 marks]Discuss the concept of standard time. Explain clearly the steps involved in arriving at standard time.
[7 marks]What is the purpose of man-machine chart ?
[3 marks]Give objectives and limitations of operation process chart.
[4 marks]Explain the difference between FPC and two handed process charts.
[7 marks]State the applications of SIMO chart.
[3 marks]Explain use of films in method analysis.
[4 marks]Give the procedure for constructing a string diagram. Discuss its applications.
[7 marks]Define qualified worker.
[3 marks]What is meant by ‘Rating’ ? Who is rated ? What for ?
[4 marks]Briefly explain different rating methods.
[7 marks]State the different types of stopwatches used in time study.
[3 marks]State various types of allowances and explain any two of them.
[4 marks]What ‘Care’ the management has to take before a new method is to be implemented?
[7 marks]What are ‘Therbligs’?
[3 marks]Explain in short about Physiological method of work measurement.
[4 marks]How can work sampling be used to study production in machine shop? Explain with the help of suitable example.
[7 marks]Discuss importance of maintaining “Time standards”.
[3 marks]Explain in short about Synthesis method of W.M.
[4 marks]Write brief note on : (i) PMTS (ii) MTM
[7 marks]