Draw the flow chart and show various steps involved in Transportation Planning process.
[3 marks]Explain with flow chart ‘Lowry’s Derivative Model’
[4 marks]Explain different types of para-transit systems.
[7 marks]Briefly discuss about various factors affecting trip production and trip attraction.
[3 marks]Briefly explain ‘Land Use Planning’ and ‘Traffic Analysis Zones’.
[4 marks]Explain the following terms with help of a sketch of study area and zones.
[7 marks]Cordon line, (ii) Central business district, (iii) Intra-zonal trip, (iv) Screen line
[ marks]What are the problems in urban transportation in the present scenario of high vehicle ownership?
[3 marks]Explain briefly various trip distribution methods with their limitations and advantages.
[4 marks]From the data given in following table, develop three trip generation equations. Show which of the parameters is more reliable and why? No. of persons in house hold Vehicle ownership Trips per day328
[7 marks]Discuss the factors which are considered for evaluation of urban mass transport systems.
[3 marks]Explain with example category analysis for trip generation analysis. What are the merits and limitations of it?
[4 marks]Astudy area has been divided in four zones 1, 2, 3, 4. The present trip distribution matrix is given with future total trip productions and trip attractions. Develop the future trip distribution matrix using Average growth factor method. Do iteration process up to 1 stage.1 D 1 2 3 4 Total present Total future Oproduction production Total present attraction 530 580 610 500 2220 - Total future attraction 810 880 740 830 - 3260
[7 marks]Describe Revealed Preference Survey and Stated Preference Survey.
[3 marks]Explain briefly: (i) Metro Rail; (ii) LRT
[4 marks]Using a gravity model, with an impedance term of the form C-α, estimate the number of trips from zone – 3 to all other zones. Take α = 1.8 Zone Travel time to zone-3 (min) Production Attractions 3 - 35000 18000
[7 marks]Discuss briefly the methods of route assignment analysis.
[3 marks]Explain with sketches transit routing problem. Discuss the main entities involved in transit routing.
[4 marks]The design year total person trips distributed between four zones A, B, Cand Dare shown in the table below. The modal split analysis shows 25/75 for private car vs public transport as an overall split. The peak period car occupancy is 2.5 persons per car and 50 persons per bus. Develop the trip matrices for the two modes and total vehicular trips. If the goods vehicles constitute at 20% of the person vehicle trips, calculate the total vehicle trips. D A B C D O A - 2000 700 2200 B 500 - 800 900 C 800 1600 - 1520 D 600 700 900 -
[7 marks]Briefly explain the Moore’s algorithm for finding shortest path.
[3 marks]On an urban corridor regular bus transit is operated with headway of 10 minutes during peak hour. The reliability of transit arrival at a stop is observed 80%. If the seating capacity of a bus is 50 and load factor 1.5. Calculate vehicle capacity of transit. If 50% schedule operated during peak hour and double decker bus with seating capacity of 75 and load factor is 1.25, what will be the change in passenger capacity?
[4 marks]Explain with sketches various types of urban forms and structures. How these are affecting transportation planning? Suggest the suitable mass transit systems for different urban forms.
[7 marks]Briefly describe the following parameters used for transit system design: Headway, Generalized cost, Vehicle capacity.
[3 marks]Describe ‘Transportation System Management (TSM)’ planning, its objectives, planning cycle and various actions. Suggest suitable ITS applications in TSM.2
[4 marks]The characteristics of two routes between two zones are given in table below. The total number of trips between these two zones is 1800 trips/hour. Assign the trips using iterative TRC trip assignment procedure (upto 2 iteration stages). Route No. No. Speed Length Critical Critical Ideal travel of Limit (km) Volume travel time with no lanes (kmph) time volume (vph/lane) (min/k (min/km)
[7 marks]1 One 50 5 600 3 2.0 2 One 80 8 1200 4 2.8
[ marks]