Explain the fundamental differences between "reconstruction" and "renovation" as they apply to building projects.
[7 marks]Write down the key consideration while renovating of load bearing structure and frame structure separately.
[8 marks]Define the term ‘retrofitting’ and list the different types of retrofitting off RCC structure.
[7 marks]What is scaffolding? Explain with neat sketch the various components of scaffolding.
[8 marks]What is shoring? Explain the types of shoring with neat sketch.
[8 marks]What is the primary goal of renovation?
[3 marks]Demolition of a building (c) Building a new structure (b) Restoring or improving a structure (d) change the use of building
[ marks]What is a common material used for creating shores?
[2 marks]Aluminium sheets (b) Bamboo sticks (c) Timber or steel (d) Plastic pipes
[ marks]Which of the following materials is most commonly reused in reconstruction projects?
[3 marks]Concrete (b) Wood (c) Glass (d) Asbestos
[ marks]Jacketing is usually done to increase:
[2 marks]Architectural beauty (b) Load-carrying capacity (c) Electrical resistance (d) Air flow
[ marks]Which of the following is NOT a type of scaffold?
[3 marks]Suspended scaffold (b) Cantilever scaffold (c) Column scaffold (d) Double scaffold Page 1 of
[2 marks]Which type of shoring is typically used to support walls that have bulged or tilted?
[2 marks]Raking shores (b) Flying shores (c) Dead shores (d) Needle shores
[ marks]What is the primary objective of Underpinning?
[3 marks]To lay a new floor (b) To replace doors and windows (c) To strengthen the foundation of an existing building (d) To build a new roof
[ marks]What is the main objective of retrofitting in civil engineering?
[2 marks]Explain the term “underpinning” and purpose of underpinning.
[5 marks]Explain cantilever scaffolding with neat sketch.
[5 marks]Explain with neat sketch the method of jacketing for RCC column and beam.
[5 marks]Explain the types of cracks and state the cause behind the cracks in building. Page 2 of
[2 marks]Increase aesthetic appeal (b) Improve structural performance (c) Reduce construction cost (d) Speed up construction