List several project Engineering documents required for any project.
[3 marks]State various International codes and standards used in Instrumentation Design Engineering.
[4 marks]List various points of difference between PERT and CPM
[7 marks]Explain Gantt Chart
[3 marks]State features of electromagnetic flow meter.
[4 marks]Explain in detail different project management functions
[7 marks]List types of contracts used in Engineering and construction industries and explain them in detail.
[7 marks]List out major events that take place while planning the schedule.
[3 marks]State the various steps of CPM network technique for project planning.
[4 marks]List functions of project manager and explain each in detail.
[7 marks]Define term ‘Project procedure ‘. What type of information it should provide?
[3 marks]What is EPC? List out the various sectors and some EPC companies in India.
[4 marks]What is statement of work? Explain in detail components of Statement of Work (SOW).
[7 marks]What is Scurve and its use in projects?
[3 marks]What are project procedures?
[4 marks]What are the points to be kept in mind while selecting level measurement instruments and state advantages and disadvantages of ultrasonic type level detectors?
[7 marks]Differentiate between pneumatic and electronics
[3 marks]Discuss panel drawings and specifications
[4 marks]Prepare detailed checklist of Good installation practices
[7 marks]State advantages of rotameter
[3 marks]State the difference between single port and double port globe body design. In slurry fluid, which kind of control valve should be used? Justify your answer.
[4 marks]Define startup. Explain in detail problems faced during this period in detail1
[7 marks]Brief about types of control valves and its application.
[3 marks]Evaluate following temperature measurement methods. i ) Filled systems, ii) RTD , iii) Thermocouple
[4 marks]Classify areas as per NEC Code
[7 marks]