Explain the terms and concepts
[14 marks]Give names of some priority rules for n job – 1 machine sequencing
[ marks]At EOQ which two costs are equal?
[ marks]Give four industry examples of Fixed Position layout.
[ marks]What is Job Shop Process?
[ marks]List different types of Queuing Behavior?
[ marks]What is Six Sigma quality standard?
[ marks]What is JIT?
[ marks]Explain Functions view of an organization.
[7 marks]Explain with practical examples of real businesses, different Product Strategies like MTS, MTO, and ATO.
[7 marks]Explain Assembly Line Manufacturing and Continuous Manufacturing processes with merits, demerits and real products examples
[7 marks]Explain Inputs, Processing and Outputs of MRP System.
[7 marks]Amanufacturing company uses a component in its assembly line. The following data is given: Annual demand (D): 3,60,000 units Ordering cost per order (S): ₹200 Carrying cost per unit per year (H): ₹25 Calculate
[7 marks]EOQ
[ marks]Average Inventory & Number of Orders per annum
[ marks]Total Ordering Cost & Total Carrying Cost
[ marks]Total Cost
[ marks]Page 1 of
[3 marks]Which criteria are considered while deciding the location of a new manufacturing units?
Explain Cost of Quality.
[7 marks]There are six jobs to be processed on 3 machines for which the time in days is given below. Job J1 J2 J3 J4 J5 J6 M1 5 8 6 4 9 M2 7 4 9 8 6 M3 6 7 5 9 4 Find
[8 marks]Optimal Job Sequence.
[ marks]Start and End times of each job on all machines and the make span.
[ marks]Explain with examples different dimensions of quality.
[7 marks]Asmall coffee kiosk in a business plaza has one serving attendant. Customers arrive at the kiosk randomly at an average rate of 12 customers per hour. Each customer takes an average of 4 minutes to be served. Calculate
[7 marks]Utilization factor (ρ) of the server
[ marks]Consider the following project: Activity A B C D E F G H I D, Predecessor(s) — A B C A E G H F Optimistic (O) 2 1 2 3 1 2 2 1 1 Most Likely (M) Pessimistic (P) 6 4 5 8 4 6 6 3 Keeping the PERT project in mind answer
[4 marks]Draw the project network diagram showing activities on arrows (AOA) and all the three times.
[7 marks]Find the expected times and variances of each activity
[7 marks]Find the Critical Path of the project and the Duration of Critical path
[7 marks]Find the Probability to complete the project in 21 days? (Take Area under standard Normal Curve for Z = 0.64 as 0.2389) Page 3 of
[3 marks]Acompany manufactures metal rods with a target diameter of 20.00 mm. Samples of size 5 are taken hourly, and the sample means and ranges for 6 samples are recorded as follows: Sample # Mean 20 20.14 19.97 20.02 20 19.95 (X) Range 0.03 0.03 0.03 0.04 0.03 0.03 (R) Calculate
[7 marks]X (average of sample means)
[ marks]R (average of sample ranges)
[ marks]Control Limits for Xchart.
[ marks]Control Limit for Rchart. Take Control Chart Constants (n = 5): A2 = 0.577, D3 = 0, D4 = 2.114
[ marks]Average number of customers in the queue (Lq)
[ marks]Average number of customers in the system (Ls)
[ marks]Average waiting time in the queue (Wq)
[ marks]Average time a customer spends in the system (Ws) Page 2 of
[3 marks]