Give the classification of voltage stability.
[3 marks]Explain in brief: Cascade tripping and Black out.
[4 marks]Describe Auto-Regressive Model and Auto- regressive Moving Average Model for load forecasting.
[7 marks]List out important points of electricity act 2003
[3 marks]Write short note on state estimation.
[4 marks]Draw hierarchy of Load dispatch centers in India. Also list out locations of NLDC, Regional LDCs and that of ALDCs of Western Region.
[7 marks]Explain meaning of deregulated power system. Discuss its advantages and limitations in relation to vertically integrated system.
[7 marks]State main components of Automatic voltage control scheme.
[3 marks]Define generation shift factor and line outage distribution factor in relation to security analysis.
[4 marks]Develop step by step the mathematical model for a state estimator using line power flows with the help of weighted least square method.
[7 marks]Explain concept of power system security.
[3 marks]Define voltage collapse. Enlist the main factors that contribute the phenomena of voltage collapse.
[4 marks]With diagram explain flow chart for contingency selection.
[7 marks]Explain speed governor dead-band and its effect on AGC.
[3 marks]Explain restoration process after black out.
[4 marks]Enlist different types of reactive power compensation methods for heavily loaded and voltage stressed power systems. Explain static VAR compensators in detail.
[7 marks]Derive necessary relation between maximum power and line length.
[3 marks]Explain role of load dispatch center in power system.
[4 marks]State and explain various operating states of power systems with necessary diagrams.
[7 marks]What is bad data in state estimation?
[3 marks]Explain importance of state estimation in power system.
[4 marks]Prove that the receiving end voltage is extremely sensitive to any change in power status at the receiving end bus.1
[7 marks]Discuss the sources of reactive power generation in the power systems.
[3 marks]Describe steps for detection of bad data.
[4 marks]Develop an expression to find the magnitude of reactive power requirement for voltage control in log transmission lines.2
[7 marks]