Compare economic dispatch and load frequency control
[3 marks]Discuss voltage regulation
[4 marks]Discuss power system static security levels
[7 marks]What is voltage collapse? Enlist the factors responsible for it.
[3 marks]Discuss the nature of load forecasting and its applications
[4 marks]Discuss average and trend curve methodology used for load forecasting
[7 marks]Discuss auto-regressive models used for load forecasting
[7 marks]Role of state estimator in power system
[3 marks]What is loadability limit of the line?
[4 marks]Two generating units rated for 110 MW and 210 MW has governor speed regulation of 5.0 and 4.0 percent from no-load to full-load, respectively. They are operating in parallel and sharing a load of 310 MW. Assuming free governor action, determine the load shared by each unit.
[7 marks]Define (i) State variables, (ii) Measurement variables, and (iii) Redundancy factor
[3 marks]What is surge impedance and surge impedance loading?
[4 marks]Discuss model of load frequency control
[7 marks]Discuss the P-Vcurves considering different operating power factor
[3 marks]Discuss maximum power transfer considering uncompensated transmission line
[4 marks]Discuss weighted least square estimation technique used for state estimation of power system.
[7 marks]Discuss Reactive Power -Voltage (Q-V) concept
[3 marks]Discuss the factor reactive power mismatch considering aspects of voltage control.
[4 marks]Determine the size of matrices for below mentioned parameter from figure-1 using weighted least square estimation technique for state estimation.
[7 marks]Matrix of state variables (ii) Matrix of measurement variables (iii) H-Matrix, (iv) Gain matrix
[ marks]What is motivation for restructured power system?
[3 marks]What is un-bundling of Electrical Power Sector?
[4 marks]Discuss the role of conjunction management in deregulated power system
[7 marks]What is power system deregulation? State its advantages
[3 marks]Discuss the following
[4 marks]Wheeling (ii) Available Transfer Capability (iii) Transmission Reliability Margin (iv) Total Transfer Capability
[ marks]Discuss the role of System Administrator/Independent System Operator in deregulated Power System Figure 1
[7 marks]Matrix of Weighting factor (considering each meter is 90% accurate)1
[ marks]