Give classification of dams (i) according to use (ii) by Hydraulic design (iii) by materials.
[3 marks]Describe Syphon Aqueduct type cross drainage work
[4 marks]Describe investigations required for reservoir planning
[7 marks]Explain different types of Run-off in brief.
[3 marks]Describe meteorological factors affecting hydrology of place.
[4 marks]Describe modes of failure of a gravity dam.
[7 marks]How the safe yield from a reservoir for a given capacity can be determined graphically?
[7 marks]What is Current meter? How it works?
[3 marks]Describe Tipping Bucket type Rain-gauge
[4 marks]Design a channel by Lacey’s theory for 40 cumecs capacity. The side slopes may be assumed to be 1:1. The average size of bed material be taken as 0.8 mm
[7 marks]Describe Border Strip Flooding Method of irrigation.
[3 marks]Explain methods of computation of average rainfall over a basin
[4 marks]Describe remedial measures for water logging
[7 marks]What are the assumptions considered for steady radial flow to a well in a confined aquifer?
[3 marks]What is Lacey’s Regime theory for design of canal in in alluvial soil?
[4 marks]Draw the cross section of lined canal in banking with all details.
[7 marks]Enlist the causes of waterlogging.
[3 marks]How Kennedy had derived the theory for canal design on alluvial soil based on observations of Upper Bari Doab Canal System.
[4 marks]Draw the cross section of lined canal in full cutting with all details.
[7 marks]Enlist the Subsurface Irrigation methods. Describe briefly any one.
[3 marks]Describe the ‘Water Pressure” acting on a gravity dam
[4 marks]What is Unit Hydrograph? What are the assumptions of Unit Hydrograph?
[7 marks]Enlist types of spillways
[3 marks]What are the necessities of lining of canal?
[4 marks]Explain causes of failures of earthen dams.1
[7 marks]