Define rate analysis and write purpose of rate analysis. [10]
[ marks]Explain factors affecting rate analysis.
[ marks]Draft a tender for repair of windows and doors of military hospital having a cost of [7] 125 lakhs fees of tender is 10,000. Last date of tender is 10th June 2018 .
Work out the quantity of items listed below of chaukidar quarter shown in fig [10]
[ marks]. 1) Earth work 2) C.C. for foundation 3) IInd class brick masonry in CM (1:6) for foundation and plinth 4) Wood work for doors, windows and ventilators
[ marks]Prepare an estimate of a RCC beam as shown in fig (b). (bar bending schedule is [10] not required)
[ marks]A Reinforced Cement concrete column in shown in figure. Calculate the quality of [13] the following items. 1. 1:2:4 cement concrete of column and footing. 2. Sand aggregate for 1:2:4 Concrete. 3. Form work for column and footing. 4. No. of cement bags 1:2:4 R.C.C. 5. Steel for column and footing in kg.
[ marks]Find the quantity and rate analysis for 100 m2 area and 12 mm thick plaster [8] (1:4).
[ marks]Explain Data required for preparing and estimate. [5]
[ marks]Explain the term specification. State the importance of it. [6]
[ marks]Define the following: (any two) [4] 1. Tender fees 2. Ernest money deposit 3. Security deposit .