o Q.9 questions. 2. Attempt any TWO questions out of Q.10 to Q.13 questions. 3. Make suitable assumptions wherever necessary. 4. Figures to the right indicate full marks. 5. Use of only simple calculator is permitted in Mathematics.
[ marks]Write short note on Prime cost.
[5 marks]Explain Detailed estimation and draw the measurement sheet and abstract sheet.
Provide the measurement of plastering work according to IS 1200.
What is SOR? Prepare the rate analysis for Brickwork in CM(1:6), take 10 m3 quantity.
Differentiate between centerline method and separate wall method.
Find the material quantity for cement concrete (1 : 2 : 4).
What is tender? What is liquidated and unliquidated damages.
What is termination of tender ?
What is contract ? Explain item rate contracts.
Prepare the estimation of following quantities given in fig. (use any method) 1. 2nd class brickwork for footings up to plinth level. 2. Plastering (Internal and External)
How the Reinforce work is calculated in RCC when the detailed drawing of steel bar is provided and not provided?
Explain the detailed specification for earthwork
Write detailed specification for R.C.Cwork.