Calculate the Volume and Area of shape given in Figure – 3.
[5 marks]Explain Detailed Estimation and Draw the Measurement Sheet and Abstract Sheet.
[5 marks]Explain the Detailed Specification for Earthwork.
[5 marks]Explain the Centerline Method with suitable example.
[5 marks]Which Types of data are required for the Estimation? Write in details.
[5 marks]Prepare the Estimation of following below Quantities by suing any Method. (Refer fig. -1)
[5 marks]Excavation (ii) P.C.C.
[ marks]Prepare the Estimation of following below Quantities by suing any Method. (Refer fig. -1)
[5 marks]2nd class brickwork for footings up to plinth level. (ii) Drawing Room & Dining Room Plastering (Internal)
[ marks]The Details of RCC Beam as shows in figure - 2. Calculate the following below quantities.
[5 marks]Total quantity of steel bars (ii) Quantity of form work
[ marks]The Details of RCC Beam as shows in figure - 2. Calculate the following below quantities.
[5 marks]Number of Cements Beg required (ii) Quantity of Concrete Work
[ marks]Write a short note on S.O.R.
[5 marks]Explain factors affecting Rate Analysis.
[5 marks]Define Rate Analysis and Write purpose of Rate Analysis.
[5 marks]Prepare a Rate Analysis for Half Brick wall (10 cm thick Partition Wall) with CM (1:3). (Take Area = 100 m²).
[5 marks]Write detailed specification on R.C.Cworks.
[5 marks]Write the Specification for the 1st class Brickwork in Cement Mortar (1:6) for Superstructure.1
[5 marks]Write detailed specification for Brickbat Lime Concrete (1:2:4) for Foundation.
[5 marks]Which factors we have to consider during Preparation of Specification. Figure – 1 Figure –
[2 marks](ii) Figure - 32
[ marks]