Explain the terms (i) Infiltration capacity (ii) Infiltration rate (iii) Rainfall excess
[3 marks]What is evaporation? Mention the factors affecting evaporation.
[4 marks]List various methods of calculating average rainfall over area and eexvpalpaoinr aItsioohny eevtaalp moeevtahroadti.o n
[7 marks]Define (i) Direct runoff hydrograph (ii) Unit hydrograph (iii) S- hydrograph
[3 marks]Explain mass curve? Explain how mass curve is prepared ?
[4 marks]Arain gauge recorded the following accumulated rainfall during the storm. Draw the mass rainfall curve and the hyetograph. Time 10. 10.1 10. 10. 11. 11. 11. 11. 12. (A.M.) 00 5 30 45 00 15 30 45 00 Accumulate 0.0 8.5 16 27 37 48 62 80 90 d rain fall (mm)
[7 marks]Apeak of flood hydrograph due to 6 hr storm is 470 m3/s. The average depth of rainfall is 8 cms. Assume an infiltration loss of 0.25 cm/hour and a constant base flow of 15 m3/sec. Estimate the peak discharge of 6-hour unit for this catchment.
[7 marks]Explain with a neat sketch, occurance of ground water at various location below the earth surface.
[3 marks]Explain Darcy’s law and what are its limitation? During the recuperation test of a 4.0 m open wee a recuperation of
[7 marks]the depression head from 2.5 m to 1.25 m was found to take place in 90 minutes. Determine specific capacity per unit well area. Also determine yield of well for safe drawdown of 2.5 m.
[ marks]Define (i) porosity (ii) specific retention (iii) specific yield
[3 marks]Distinguish between permeability and transmissibility of soil
[4 marks]Design an open well in fine sand to give a discharge of 0.03 cumec when worked under a depression head of 2.5 m.
[7 marks]Define (i) safe yield (ii) secondary yield (iii) design yield.
[3 marks]Explain measure to reduce evaporation losses from reservoir.
[4 marks]Explain with neat sketch storage zones of reservoir1
[7 marks]Define (i) Trap efficiency (ii) Density currents (iii) capacity- inflow ratio
[3 marks]Discuss in details factors affecting selection of dam type?
[4 marks]What are the various causes for the reservoir sedimentation and how would you reduce the rate od sedimentation?
[7 marks]Define flood routing. What are the uses of flood routing?
[3 marks]Explain roof top water harvesting method
[4 marks]Explain various causes of flood
[7 marks]What is artificial ground water recharge explain any two methods
[3 marks]Give the functional requirements of a multi – purpose projects
[4 marks]Explain drought and causes of drought
[7 marks]