Write brief note on gravity dam with its salient features.
[3 marks]Differentiate between unconfined and confined aquifer.
[4 marks]Discuss various measures are adopted for water conservation.
[7 marks]What is S-hydrograph? Also give its uses.
[3 marks]Explain various effects of draught.
[4 marks]Discuss various methods of direct measurement of consumptive use of water.
[7 marks]Define term ‘flood routing’. Discuss Muskingum’s method for channel routing.
[7 marks]Define following terms: Storage co-efficient (2) Aquifuge (3) Specific retention
[3 marks]Discuss non-automatic type of rain gauge
[4 marks]What is runoff? Also discuss various factors affecting runoff from catchment area.
[7 marks]State Darcy’s law. What are its limitations?
[3 marks]Discuss various physiographic factors affecting shape of hydrograph.
[4 marks]Define spillway and describe various bucket-type energy dissipaters.
[7 marks]Write brief note on reservoir losses.
[3 marks]Classify hydropower plant based on storage characteristics
[4 marks]The direct runoff hygrograph (DRH) resulting from 5.0 cm effective rainfall of 6-hr duration is given below. Determine catchment area and ordinates of 6- hr unit hydrograph. Time (Hour) 0 6 12 18 24 30 36 DR Ordinate 0 20 170 325 365 315 235 (m3/s) Time (Hour) 42 48 54 60 66 72 DR Ordinate (m3/s) 160 100 65 35 15 0
[7 marks]Enumerate limitations of unit hydrograph theory.
[3 marks]Explain following terms: (1) Density currents (2) Trap efficiency
[4 marks]Derive an expression for discharge in form of drawdown from well fully penetrating an unconfined aquifer.
[7 marks]Write functions of following components of hydropower plant. Penstocks (2) Surge tank (3) Draft tube
[3 marks]Describe double ring infiltrometer to determine rate of infiltration.
[4 marks]What is transpiration? Discuss factors affecting it and phytometer method to measure rate of transpiration.
[7 marks]Discuss levees as flood control measure.
[3 marks]Explain procedure of separating base flow in hydrograph.
[4 marks]Discuss functional requirements of water resources projects.
[7 marks]