Which types of Data are required for the Estimation? Draw the Abstract and Measurement Sheet.
Prepare the Estimation of following quantities given in fig.1 (Use any Method) 1. Excavation 2. P.C.C 3. 2 nd class brickwork for footings up to plinth level.
What is mean by ‘Specification’? Enlist and explain the various types of specification.
Find the rate of Plain cement concrete (1:1.5:3) per m3. by rate analysis. Assume suitable rates of material and labour.
Enlist the Different types of Detailed Estimate. Explain any two.
Find the quantity and rate analysis for 100 m2 area and 12 mm thick plaster (1:4).
Write the Specification for the 1st class brickwork in CM (1:6) for superstructure. Page 1/2 Figure - 1 \\\ Page 2/2