How Engineer can achieve economy in a construction project?
[3 marks]Explain in detail role of construction project manager on construction
[4 marks]pErxopjelacitn. the different phases of project specifying the activities to be carried out in each of phases.
[7 marks]Distinguish between CPM and PERT.
[3 marks]Differentiate between serial and Parallel activities.
[4 marks]What is work breakdown structure in construction project? Draw work breakdown structure of a residential building project.
[7 marks]Explain Fulkerson’s rules for numbering the events of a network.
[7 marks]Write a short note on a FSN analysis.
[3 marks]Discuss evaluation of a public projects.
[4 marks]What is job layout? Draw job layout for a Commercial complex building and for a Dam site.
[7 marks]Explain developing site organization.
[3 marks]Enlist duties of Executive Engineer and Assistant Engineer.
[4 marks]What are the advantages and disadvantages of (I) Centralized and local purchasing and (II) Early and late procurement?
[7 marks]What are the advantages of scheduling?
[3 marks]Discuss about Labour schedule and Financial schedule.
[4 marks]What are the objectives of resources allocation? Explain, what do you mean by resources leveling? Explain step by step process of resource leveling.
[7 marks]Explain project control process.
[3 marks]Draw a specimen material schedule for a project and explain it.
[4 marks]Explain why time cost trade off is necessary? Discuss various ways to reduce the activity duration.
[7 marks]Enlist various safety equipments.
[3 marks]Give safety measures for scaffolding and excavation.
[4 marks]Enlist the all causes of accident happen at site. Discuss job of safety officer at site in brief.1
[7 marks]List the factor affecting cycle time of truck.
[3 marks]Give comparison between conventional construction method and mechanized method.
[4 marks]Enlist the various hoisting equipment. Draw neat sketches & explain working of any three equipments.
[7 marks]