Explain the importance of construction management.
[3 marks]Discuss the different phases of construction management.
[4 marks]Draw a Work Break Down structure of GSRTC Bus Station.
[7 marks]Discuss the sources of fund availability in construction project.
[3 marks]Define the following 1) Activity 2) Dummy Activity 3) Event 4) parallel activity
[4 marks]Discuss Bar chart technique with construction of compound wall example.
[7 marks]Discuss Line of Balance, Mile stone chart and Compare with each other.
[7 marks]Explain the function of management as organizing, staffing
[3 marks]Justify “inventory is a heart of material management.”
[4 marks]Develop a Job/ site layout for construction of Bridge.
[7 marks]Differentiate between float and slack.
[3 marks]Compare resource leveling vs. resource smoothening
[4 marks]Discuss updating. Explain in detail procedure for updating.
[7 marks]Explain the importance of crashing.
[3 marks]Describe the lean construction concept of project management
[4 marks]From the following network and find out activity Eduration 5, project duration, critical path, Critical activity D H A 2 6 5 13 8 5 E 7 1 B 6 F I3 C 9 13 12 G6
[7 marks]Discuss the various types of precedence relationship with example.
[3 marks]Explain the use of Building Information Modeling(BIM) in construction management.1
[4 marks]Draw the network from following three time estimate, find out total project duration. Activity Optimistic time Pessimistic time Most likely time 1-2 5 15 1-3 4 12 2-4 3 13 3-5 4 18 4-5 7 17 5-6 2 10
[6 marks]Identify the role of inspection in Quality control.
[3 marks]Describe the Construction Quality Assessment System (CONQUAS)
[4 marks]Discuss the causes; effects and preventive measure of accident occur on construction site.
[7 marks]Discuss the factor affecting for owning and operating cost.
[3 marks]Discuss the importance of ISO 45001 on construction site.
[4 marks]Describe the Tunnel Boring Machine with its use, function, advantages etc
[7 marks]