Differentiate planning vs. scheduling of project
[3 marks]Classify the phases of construction project.
[4 marks]Organize a work break down structure of construction of highway.
[7 marks]Explain the different types of float and explain its uses for decision making.
[3 marks]Differentiate CPM vs. PERT
[4 marks]Critique “ Bar chart is not use for big and complex project
[7 marks]Define: Crashing, Indirect cost, Normal time, Scurve, Normal cost, Optimization, and Cost slope
[7 marks]Explain the method used for resource allocation
[3 marks]Draw a Network of following activity and find out critical path Activity Duration 1-2 1-3 1-4 2-5 3-6 4-6 5-6
[6 marks]Draw a job layout for construction of Bridge
[7 marks]Explain the procedure use for material management
[3 marks]Calculate the project duration from following activity Activity Duration Predecessor successor A 5 -- B,C,D B 7 A F C 3 A E D 4 A G E 2 C -- F 8 B G G 4 D,E --
[4 marks]How to judge the activity for crashing? Explain the procedure of crashing
[7 marks]Define the term 1) Fatal accident 2) Quality control 3) Quality Assurance
[3 marks]Enlist various BIM software with application in civil engineering1
[4 marks]Differentiate CONQUAS Vs. Quality assessment system used in construction site in India.
[7 marks]Describe the ISO 450001.
[3 marks]Enlist the advantages of lean construction as a project management
[4 marks]Write a short note on Occupational Safety and Health Administration (OSHA).
[7 marks]Enlist the different earthmoving equipment and Explain any one with sketch.
[3 marks]Compare TBM vs. other tunnel construction equipment
[4 marks]Differentiate between standard equipment and special equipment.
[7 marks]Draw a line diagram of dragline excavator and states name of its parts.
[3 marks]Differentiate pile boring vs. Pile driving equipment
[4 marks]Explain the different dewatering equipment.
[7 marks]