Discuss reason behind the importance of construction management.
[3 marks]Justify in detail role of General Foreman at construction site.
[4 marks]Explain Pre-project phase and post project phase in detail.
[7 marks]Briefly explain VED analysis.
[3 marks]Differentiate between serial and Parallel activities.
[4 marks]Write a short note on Indian construction industry.
[7 marks]Explain Fulkerson’s rules for numbering the events of a network.
[7 marks]Distinguish between CPM and PERT.
[3 marks]Discuss evaluation of a public projects.
[4 marks]What is job layout? Draw job layout structure of a large housing project.
[7 marks]Explain developing site organization.
[3 marks]Define material management. Explain its objective.
[4 marks]What mean by organization? Explain characteristics of good organization.
[7 marks]Discuss positive points of scheduling.
[3 marks]Enlist duties of Executive Engineer and Assistant Engineer.
[4 marks]Enlist merits and demerits of centralized and local purchasing.
[7 marks]Explain project control process.
[3 marks]Differentiate between quality control and quality assurance.
[4 marks]Define mean of inspection. Also Prepare a checklist for column form work inspection before casting which carried out at construction site.
[7 marks]What is mean by tool box meeting? Enlist various PPE which required at construction site.
[3 marks]Discuss job of safety officer at site. Explain important of assembly point at site.
[4 marks]Enlist the all causes of accident happening at site. Also discuss about remedial measures to prevent it.
[7 marks]Explain terms Loading time, Return time and Dumping time.
[3 marks]Give comparison between conventional construction method and mechanized method.
[4 marks]Enlist the various hoisting equipment. Explain Tower crane and Winch with neat sketch.
[7 marks]